Bathrooms · Montreal

Bathroom renovation in Montreal

A bathroom concentrates many details in a small space. Preparation, levels, transitions, ventilation and plumbing access need to be considered together before walls are closed and finish materials are installed.

What the work can include

  • Removal, protection and job-site preparation
  • Surface repairs and preparation for tile
  • Vanity, storage and trim installation
  • Tile, grout, caulking and finish work
  • Drywall repairs, painting and accessories

Items to verify on site

  • The condition behind existing finish materials
  • Actual room dimensions and door clearances
  • Ventilation, clearances and technical access
  • Tile, vanity, fixture and storage choices

How a project runs

Step 01

Talk it through

Call or text what you have in mind. Photos help a lot. You'll get a straight answer on fit and timing within 24 hours.

Step 02

Site visit

We measure, check the existing conditions and go over materials and options with you in person. The visit is free and comes with no obligation.

Step 03

Written scope

You receive the scope of work in writing before anything starts. Both sides know exactly what's included.

Step 04

Build and final walkthrough

The site stays tidy and the job ends with a walkthrough. Nothing is finished until you agree it is.

Carlo Renos · Montréal

Plan the bathroom site visit

Photos of the room, vanity and problem areas provide a useful starting point before the site visit and measurements.

Back to home
CallTextWhatsApp